ISR logo
Projects

Lot 27: Preparatory study for implementing measures of the Ecodesign Directive to Uninterruptible Power Supply

Lot 27: Preparatory study for implementing measures of the Ecodesign Directive to Uninterruptible Power Supply

14/03/2012 - 14/06/2014

Lot 27: Preparatory study for implementing measures of the Ecodesign Directive to Uninterruptible Power Supply

Reference

Lot 27

Funding entity

Universidade de Coimbra

Role of ISR

Other